Introduction of Temporary Stand

Standard Building Procedure

  • 1
    Positioning

  • 2
    Installation of Bottom Board

  • 3
    Installation of Jack base

  • 4
    Installation of divdrel panel frame and brace

  • 5
    Installation of (Steel) Frame

  • 6
    Installation of Scaffolding Board etc.

  • 7
    Installation of Handrail

  • 8
    Installation of Riser Plate.

  • 9
    Installation of Seat. (completion)

*Repeat 4 and 5 for higher stand.
*The demolition will be done by the reverse procedure.